darben
Well-Known Forumite
Highways England are holding a public meeting on the 19th of July 6pm at Blessed Bills - they are doing a presentation followed by a q&a session - l would encourage people to turn up and express their concerns about the contempt Highways England have shown to the people of Stafford.
The letter talks about Bridge demolitions in September- at the previous meeting I was told these bridge collapses were to happen in July, so they are already running considerably behind their own schedules in the early stages of the ‘4 year project’ and as the letter states they still haven’t a date in September to carry out these works.
I was also told there was money made available for road surfaces to be improved through the diversion routes, it is self evident the road surface has not been improved - but in fact further deteriorated during the current diversions.
The letter is a public letter, but I have been made aware that it has a limited distribution so please feel free to share.