Welcome to Stafford Forum. Please or sign-up and start posting!
There's sumat going on down Crooked Bridge tho. God knows what, cos there's still 100s of potholes.corporation street got to be a contender for stafford's most destroyed road. Still always gets missed off the resurfacing job list.
There's sumat going on down Crooked Bridge tho. God knows what, cos there's still 100s of potholes.
There's sumat going on down Crooked Bridge tho. God knows what, cos there's still 100s of potholes.
Would be nice. Babb.Have they brought back hanging ?
I think (hope) the second one is where they actually finish the job, after the cars have dragged the stones all around StaffordThey're doing Parkside soon.
They resurfaced my road last year so not sure why it's needs da treatment as it's hardly worn out yet.
And they're closing the roads for two treatments which are two days apart.
The plans show it as two lanes in each direction although I must admit the actual road they're building doesn't look very wide.It would seem that the dual carriageway on beaconside is only a single lane in each direction, the physical separation makes it a 'dual' carriageway.
The plans show it as two lanes in each direction although I must admit the actual road they're building doesn't look very wide.
If it isn't actually two lanes what is the point of the work and disruption? Not that 300m of dual carriageway is going to make much difference.
View attachment 16641
And roadsWhat have the Romans ever done for us?!
Sewers!
Education!
Apart from Sewers, Education, Sanitation, the Aquaduct?
Wine!
Yes, Wine!
And Sewers!!
And roads
Stone road north, upto Redhill roundabout, closed for approx 4 weeks from April 21st.
Unless they postpone it again.