Baswich Ender
A few posts under my belt
I've just read about plans to divert traffic from the M6 through the town for upto a month. Just when we thought things couldn't get any worse, THEY WILL !!!!!!
Welcome to Stafford Forum. Please or sign-up and start posting!
It seems fair enough - it will take about a month to get through...I've just read about plans to divert traffic from the M6 through the town for upto a month. Just when we thought things couldn't get any worse, THEY WILL !!!!!!
They could use the old A34, up the side of the Waggon & Horses, just for further entertainment.Fear not
The diversion is through Hyde Lea, Highfields, Derrington, Seighford, Gt Bridgeford
You will hardly notice..........
Calling in at the soon-to-be-built Dog and Doublet Drive-thru, no doubtNo via Acton Hill, out via Baswich to Wolsey Bridge and then back towards Stone
Oh yes.County Council leader Philip Atkins appears oblivious to the problem. When is the new Doxey by-pass starting, will that be going on at the same time ?
Out Uttoxeter way I think.Where does the (b)leader live?
Out Uttoxeter way I think.
Your statement includes "right mind" and "logical".......So the complaint is that they might close the J13 on ramp for a bit? Not only can I not see that happening (the only other junction that has been closed for so long is J9 and that was to prevent congestion on an already busy stretch, as the M5 was simultaneously being repaired), nobody in their right mind would divert to J14, the logical route would be to go down to j12.
What a load of old shit. The Highways Agency / Highways England have been installing 'smart motorways' on the M6 south of J13 for ever and a day and they haven't had to close the motorway for weeks on end before. It is literally not a thing that would ever happen.
Thanks MP LeFroy for campaigning against an imaginary problem. What a great use of your time.