The "trench" that was just prior to the roundabout alongside Beconside Surgery was sorted on Friday but only the bare minimum, nothing before or after as would be logical seeing as they had to setup stop go ?
The same logic that has seen the junction with Corporation St / Weston Rd having work done over the past month (or 2) with the hole outside the Esso garage being done & the sunken drain on the nearside before the lights sorted, but not the hole that we all drive around "at the the lights" heading south, or the other sunken drain in the middle of the road just back from the repaired one ?
To any up & coming people to the workforce it used to be that many industries had a 'job for life" tag that has now all but gone, not so working for the council especially on the pothole gang.