As if the North side of town hasn't been hit enough, they're doing more roadworks along the Weston Road near the University.
In recent times this means that on my commute i've had:
1. Roadworks for gas.
2. Roadworks to install new roundabout.
3. Roadworks for the new school (ex-Uni library).
4. Roadworks for water pipe renewal.
5. Roadworks for changes to Tech Park traffic lights.
6. Roadworks for sewer pipe renewal.
Is that not enough disruption?
Can't the council get a flippin move on and connect the firestation road to Tixall Road or remove the bollards down Birkdale Drive?
In recent times this means that on my commute i've had:
1. Roadworks for gas.
2. Roadworks to install new roundabout.
3. Roadworks for the new school (ex-Uni library).
4. Roadworks for water pipe renewal.
5. Roadworks for changes to Tech Park traffic lights.
6. Roadworks for sewer pipe renewal.
Is that not enough disruption?
Can't the council get a flippin move on and connect the firestation road to Tixall Road or remove the bollards down Birkdale Drive?