DoggedWalker
Well-Known Forumite
The closure into town seems to have caused absolute chaos, much worse than when the other direction was closed a week or so ago.Shocking queueing along the A34 towards Stafford recently- literally queueing from the top of Yarlet bank all the way to the Redhill roundabout. I suppose the dual carriageway reduced to one lane around Pets at Home roundabout, the A34 into Stafford closed & drivers blocking entry into the Redhill roundabout doesn't help. Almost gave up. When do the Redhill roundabout roadworks start - converting it into 3 lanes and installing traffic lights? I guess that'll be an 18 month rather than a 6 week job?
The resurfacing work seems painfully slow going. Think the same people doing the paving in town must be doing it