staffordjas
Well-Known Forumite
The letter we have had through the post says it will be closed completely from Milford to School lane. Noticed the signs said closed 11th Jan to 15 June today as well as I walked down there .(The coppers were out with the speed trap vans along that stretch this morning, and must have been catching quite a few today. The brakes were being slammed on, but I should think most far too late to avoid a fine.. )
Letter reads:
'For Brocton Road Roundabout along the A513 to School lane...........'Unfortunately, we will need to close this section of the road to keep our work force and everyone else who uses the road safe. Access will be maintained for residents wherever possible. '
and..
'The section of work between the Radford bank junction(Cannock Road Round-about) to School lane will be carried out under two/three way lights, to save time this work will be undertaken at the same time as the road closure'
Letter reads:
'For Brocton Road Roundabout along the A513 to School lane...........'Unfortunately, we will need to close this section of the road to keep our work force and everyone else who uses the road safe. Access will be maintained for residents wherever possible. '
and..
'The section of work between the Radford bank junction(Cannock Road Round-about) to School lane will be carried out under two/three way lights, to save time this work will be undertaken at the same time as the road closure'