High-speed rail plans announced by government.

The Hawk

Well-Known Forumite
As far as I know it is only the Birmingham to Manchester bit that has been cancelled, the London to Birmingham stretch is still going ahead (at least for the moment)
The bit that is still going ahead (according to Rishi) is the Handsacre/Birmingham Curzon Street to Old Oak Common stretch of phase 1, with the Old Oak Common to Euston bit the subject of some funding issues, before it can also be confirmed.

The Handsacre (not Birmingham) to Manchester bit is the phase 2 bit that has been cancelled and the eastern bit has long been consigned to history, as has HS3 (Manchester-Bradford-Leeds).

Let's not worry about the 10s of billions of pounds that we have wasted on the bits that have been cancelled, plus the 10s of billions we are still wasting on what is left. I mean who need a well funded NHS, when you will be able to get from Handsacre to Old Oak Common in 45 minutes.
 

tek-monkey

wanna see my snake?
The bit that is still going ahead (according to Rishi) is the Handsacre/Birmingham Curzon Street to Old Oak Common stretch of phase 1, with the Old Oak Common to Euston bit the subject of some funding issues, before it can also be confirmed.

The Handsacre (not Birmingham) to Manchester bit is the phase 2 bit that has been cancelled and the eastern bit has long been consigned to history, as has HS3 (Manchester-Bradford-Leeds).

Let's not worry about the 10s of billions of pounds that we have wasted on the bits that have been cancelled, plus the 10s of billions we are still wasting on what is left. I mean who need a well funded NHS, when you will be able to get from Handsacre to Old Oak Common in 45 minutes.
I've dreamed of getting to old oak common in 45 minutes! Now what train from stafford goes to handsacre...
 
Top