Welcome to Stafford Forum. Please or sign-up and start posting!
'They' are treating us all like shit.Are 'they' effectively treating the 5013 as a one way road westbound from Lloyds to the motorway?
Rumor has it that is when beaconside will be dug up. also, baswich lane closure and m6 smart motorways work start.It’s not even March yet, so we’ll have another bout of everything being dug up soon enough.
Rumor has it that is when beaconside will be dug up. also, baswich lane closure and m6 smart motorways work start.
Top of Radford Bank near the double mini-roundabout at lunchtime. White van pulled over to the side of the road with four police cars clustered tightly around it, lights flashing everywhere. Slowed down traffic a bit.
I live in Parkside and travel towards Great Bridgeford every weekday at about 8. It is now not a rare sight to pass traffic backed up all the way down Beaconside, around the A34 island (and quite far up the A34 coming towards Stafford), plus virtually the full length of the A34 slip road towards J14. All because of them stupid Beaconside lights.The (normal) Creswell situation will be most exacerbated by the Lloyds/Bristol Street roundabout chaos, I expect, but the Beaconside issue won't be helping, as that is the indicated diversion to avoid the Stone Road closure.
I live in Parkside and travel towards Great Bridgeford every weekday at about 8. It is now not a rare sight to pass traffic backed up all the way down Beaconside, around the A34 island (and quite far up the A34 coming towards Stafford), plus virtually the full length of the A34 slip road towards J14. All because of them stupid Beaconside lights.
I've said it before but can't help but imagine what it'll be like when they have done the planned 3 sets of lights down Beaconside plus the possible lights around the A34 island! Not to mention when all 9000 or so houses have been built off Beaconside!
What Baswich Lane closure?Rumor has it that is when beaconside will be dug up. also, baswich lane closure and m6 smart motorways work start.
I'm informed Highways have insisted these works happen during the School Summer Hilidays. I've requested that Network Rail confirm the dates of their works as a result, but still waiting, hence why I've not posted this information our yet myself. Once these dates are confirmed I'll post. Steveb BCG
Because doing the work in the summer holidays will make matters sooooo much better!I'm informed Highways have insisted these works happen during the School Summer Hilidays. I've requested that Network Rail change these dates as a result, but still waiting, hence why I've not posted this information our yet myself. Once these changes are confirmed I'll post. Steveb BCG
and there was only one pointless sequence to sit through at the Parkside lights.