Stafford Traffic.

gilesjuk

Well-Known Forumite
Not so much a water main bursting, but workmen bursting it. If only the plans which detail where the pipes and cables are were accurate.

I still remember a similar incident along Beaconside in the 2010s. Water running everywhere and a massive bulge appeared under the roadabout by the old uni site.
 

c0tt0nt0p

Well-Known Forumite
Avoid stone, there's been a water main burst and a34 north by the garage is closed and traffic is being diverted into town = gridlock
Severn Trent were there Monday pm around 3 and they're was substantial water flowing down the road at the same spot
 

Gramaisc

Forum O. G.
Major works on the A41, from the Forton roundabout, north of Newport, to Hinstock, over the summer, starting on July 24th and featuring some 24 hour closures.
 

Mudgie

Well-Known Forumite
There'll probably be a Lake-Nearly-Every-Street-In-Stafford soon if the council don't clear the blocked rainwater drains every few years.
 

Glam

Mad Cat Woman
Youngest (Jesus looking thing) reckons 2 weeks and the main bit of the Pets at Home roundabout will be done. Then 2 more weeks for faffing and it should be finished. That's what he's been told at work.
 

GNM67

Well-Known Forumite
they told us that for the housing estate junction, still took them 3 months.

the pets at home roundabout still needs the centre doing, the crossings and lights, cycle paths up to the existing junction
 

Thehooperman

Well-Known Forumite
.......The pets at home roundabout still needs the centre doing, the crossings and lights, cycle paths up to the existing junction
Piece of pish, they've diverted those speed merchants doing Market Square to speed the job up.

It will all be ready in 3 weeks, months years 😂
 

Glam

Mad Cat Woman
Youngest (Jesus looking thing) reckons 2 weeks and the main bit of the Pets at Home roundabout will be done. Then 2 more weeks for faffing and it should be finished. That's what he's been told at work.
they told us that for the housing estate junction, still took them 3 months.

the pets at home roundabout still needs the centre doing, the crossings and lights, cycle paths up to the existing junction
I can only go by what he's been told from Pets at Home.
 