The piece gets at the building COULD be finished before the end of year. What funished means contractors will have done their job. However my understanding is car parks, landscaping and petrol may not be ready at the same time.
Anyway Morrisons have their own contractors to deck the place out so to speak. So Simons will out others will move in.
As the building could be finished 4 months ahead of schedule and without an actual end date for completion if finished early and only PRACTICALLY completed( this is not completed), means timescales will need review/ changing based on the original time frame has changed. There is no way it would operational before Christmas, almost October and its not even water tight yet.
It also states from of the 11 stores closing and small M stores and non profit which were announced yesterday, new openings and stafford will not be effected and a 25 year lease is signed. As it stands
also another 2 units have to he built closer to north walls yet.
Anyway Morrisons have their own contractors to deck the place out so to speak. So Simons will out others will move in.
As the building could be finished 4 months ahead of schedule and without an actual end date for completion if finished early and only PRACTICALLY completed( this is not completed), means timescales will need review/ changing based on the original time frame has changed. There is no way it would operational before Christmas, almost October and its not even water tight yet.
It also states from of the 11 stores closing and small M stores and non profit which were announced yesterday, new openings and stafford will not be effected and a 25 year lease is signed. As it stands
also another 2 units have to he built closer to north walls yet.